Paver base calculator for West Virginia

The hidden layer beneath the pavers helps the patio stay level over five years. Calculate it in tons at compacted depth.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches
Add 5% extra for compaction & spillage

The stone below pavers costs several times less per square foot than the pavers themselves, yet failures usually start in that lower layer. Patio problems we hear about commonly trace back to what sits beneath the pavers. Use this calculator to size compacted crusher run or a comparable blend at 1.5 tons per cubic yard: 4 inches for foot traffic and 6-8 under vehicles. The +10% compaction allowance is already selected. Bedding sand stays separate in a strict 1-inch layer and has its own calculator.

Plan the base

  1. Find the paved area in feet, then extend the base 6 inches beyond each unclosed paver edge. This gives the edge restraint a supported foundation.
  2. Use 4 inches of compacted material for patios and walkways, 6 for driveways or clay soil, and 8 under driveways with soft ground.
  3. Divide cubic feet by 27 for yards, multiply by 1.5 for tons, then keep the +10% allowance on.
Tons = (Base area sq ft × Compacted depth in ÷ 12) ÷ 27 × 1.5 × 1.10
Excavation depth = base + 1" bedding + paver thickness − reveal

Project depth and coverage

ProjectCompacted base depth1 ton covers
Walkway or garden path4 inches≈ 54 sq ft
Patio or seating area4-6 inches≈ 43 sq ft
Driveway with cars6-8 inches≈ 31 sq ft
Clay or soft subgradeadd 2 inches + fabricn/a

Layers from turf to the finished paver

Figure excavation by adding every layer. A common patio has 4 inches of base, 1 inch of bedding sand, and a 2 3/8 inch paver flush with the lawn. That equals a 7.5-inch excavation, adjusted for the reveal above grade. Put that depth on a stake and use it while digging. Going too deep means paying to remove soil, with the Dirt Calculator run backward showing the yards leaving the hole, then buying stone to restore the grade.

Base installation steps

  • Compact the base in 2-inch lifts using a plate compactor, and mist each lift. Slightly damp material compacts tighter than dry material.
  • Grade the finished base at a 2-3% fall away from the house. The bedding sand and pavers will follow that grade.
  • Install edge restraint over compacted base rather than lawn soil. The 6-inch extension provides its support.
  • For clay, put woven geotextile beneath the base. It prevents stone from sinking into the subgrade during wet seasons.
  • Base depth cannot be replaced with a deep sand layer. Sand shifts, and that can create a wavy patio.

Reusing pavers: check the base

For a patio reset, begin below the pavers. Lift them out, remove the worn bedding sand, and assess the stone layer. Keep it if it is level, firm, and draining properly, then install a fresh 1-inch bedding layer. The stone order drops to a tenth of a complete new installation. Tear out the base as well where it has settled, turned soft, or holds water. On a hillside, seepage can bring the same trouble back under replacement pavers.

Example: a 16 x 12 patio

Start with 192 square feet of paved area. A 6-inch extension along three open sides brings the base footprint to 210. At 4 inches compacted, 210 x 0.333 = 70 cubic feet = 2.6 cubic yards, or about 3.9 tons and 4.3 with the allowance. Order 4.5 tons of crusher run plus 0.9 tons of bedding sand from the Paver Sand Calculator in one free delivery. Arrange the drop after excavation, since stone left on the lawn for two weeks can kill a rectangle of grass.

Questions on base depth, digging and tons

How can I calculate my paver-base amount?
Use the paved area plus a 6-inch border. Multiply by compacted depth in feet, divide by 27, multiply by 1.5 tons, and add 10%. A 10 x 10 patio at 4 inches needs about 2.2 tons, so order 2.5.
Will 2 inches of paver base work?
No. Two inches is for leveling, not for base. Foot traffic requires four compacted inches as the minimum; too little base commonly leads to dips and loose pavers.
What base depth do pavers need?
Use four compacted inches for patios and paths. For surfaces used by cars, use 6 to 8, with 2 extra inches for clay or wet ground. On hillside sites, direct seepage away before it reaches the base.
How far should I dig below pavers?
Add the base, 1 inch of bedding, and the paver thickness, then subtract the reveal above grade. Standard 2 3/8 inch pavers over a 4-inch base need about 7.5 inches below the finished height.
For a paver base, crusher run or screenings?
Make crusher run, or road base, the structural layer for the full 4-plus inches. Use screenings only in a thin leveling layer over compacted base. Screenings by themselves retain water and pump under load.
Can pavers go down without base material?
Yes, over a sound concrete slab with a bedding layer and drainage gaps. No, over soil. Pavers laid directly on dirt move with frost heave and rain, often showing it within one season.

The base supports the pavers.

Order crusher run and screenings by the ton with bedding sand, including free delivery.

Shop Crusher Run