Rip rap calculator for West Virginia

Figure bank and slope tonnage from the installed stone depth, not a thin landscape-stone layer.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches
Add 5% extra for compaction & spillage

A ton of riprap covers roughly 17 square feet. That amount can seem surprising. Armor stone is installed at 12 inches or greater, so a ton covers about one tenth as much area as landscape rock. This calculator figures depth by layer, using 3,100 lb per cubic yard for rip rap generally sized 4 to 12 inches and up.

Measure an armored bank

  1. Run your tape along the slope face instead of measuring level ground, then multiply that distance by the shoreline or channel length.
  2. Set the stone layer at 1.5 to 2 times the largest rock dimension. Use at least 12 inches for erosion control.
  3. Divide cubic feet by 27 for cubic yards, then multiply by 1.55 for tons.
Tons = (Slope-face area sq ft × Layer thickness in ÷ 12) ÷ 27 × 1.55

Per-ton coverage

Layer thickness1 ton coversTons per 100 sq ft
12 inches≈ 17 sq ft5.7
18 inches≈ 12 sq ft8.6
24 inches≈ 9 sq ft11.5

How to place stone so it holds

  • Start with fabric or bedding: install non-woven geotextile beneath the stone, or use 3-4 inches of #4 stone. Riprap laid directly on soil can look sound for one season before the underlying bank erodes and the rock settles.
  • Start with the toe. Install the lowest stones below the waterline or expected scour depth since riprap can unravel from the bottom.
  • Before placing stone, cut the slope to 2:1 or flatter. A steeper bank needs engineering rather than more stone.
  • Use equipment or hand placement on the exposed upper course to lock stones together rather than leaving them where they land.
  • For culvert outlets, extend the apron 4-6 pipe diameters downstream. Water scours there.

Example: 50 feet of pond bank

For 50 feet of shoreline with a 6-foot slope face, the area is 300 square feet. With an 18-inch layer: 300 x 1.5 = 450 cubic feet = 16.7 cubic yards, or about 26 tons of riprap and 27 with the small allowance. Use a roll of geotextile, or about 4 tons of #4 stone for a rock bed. Check the truck route before you order. The final 20 feet at a pond edge can trap a loaded truck, and moving stone twice costs twice.

Following the first heavy rain

After water recedes, walk the creek bank. Check the toe for displaced rock, exposed soil in the gaps, visible fabric, and any scour at the outfall apron. Put shifted stone back in place and use reserve material to cover sparse areas. A brief check a couple of times each year is the full upkeep plan. Riprap is meant to carry the load with little work from you.

Stone sizes at a glance

Choose stone for the water force. Riprap from four to eight inches works for pond edges, downspout outlets and gentle streams. Eight to twelve fits lake banks with boat wake and quicker channels. Engineered projects such as highways and spillways have specified stone classes and layer depths, so use the plans rather than this guide. If deciding between sizes, choose larger stone and a deeper layer. More weight gives better tolerance.

Riprap amounts, sizing and placement

How can I estimate my riprap quantity?
Take the slope-face area times the layer thickness in feet, divide by 27, and multiply by 1.55. For a 10 x 10 test patch at 12 inches, the result is 37 cubic feet, or about 2.1 tons.
How much ground will 1 ton of riprap cover?
At a 12-inch layer, plan on roughly 17 square feet per ton. At 18 inches, it is 12 square feet. For budgeting at the standard layer, allow 5.5 to 6 tons for each 100 square feet.
What volume is 1 ton of riprap?
Expect a pile of about two-thirds of a cubic yard, close to a washing machine in volume. At the 6-8 inch size, that comes to 25-35 stones. Laid at the right depth, it covers a 4 x 4 bank section.
What is the cost of 1 ton of riprap?
RipRap costs more than construction stone and is sold by size class. See the current amount on our RipRap product page, with delivery free. Fabric and bedding stone add a fraction more and belong in the system.
What depth should a riprap layer have?
Use a layer one and a half to two times the largest stone dimension, no less than 12 inches. For typical 4-12 inch residential stone, use 12-18 inches. Larger stone or fast water may call for 24.
Is hand placement possible for riprap?
Yes, for stone up to about 6-8 inches, if you have gloves and can handle the lifting. One ton means 25-35 lifts. Larger material needs equipment. A skid steer can place in an hour what people may set by hand in a day.

Protect exposed banks with armor stone.

Buy RipRap by the ton with free delivery and add #4 bedding stone beneath it.

Shop RipRap

Select aggregate for the calculated project size